Powerline R/W Brushing

Powerline operators know that regular R/W maintenance is crucial to reduce the risk of line strikes, outages, and fires from trees and brush. Whitecap Resources called in EM3 Services in 2021 to provide much-needed brushing services to their network of powerlines, including the removal of merchantable-sized trees.

Through careful coordination with our logging partner and close communication with the Project Owner, EM3 led the clearing of 10’s of kms of powerline R/W to complete remove the trees and handle the wood fibre on site. The result: a R/W free of anything that can strike the powerline with a smooth surface available for maintenance and future mowing activities.

Some of our Other Projects

Transcanada Pipeline / Paul Paquette & Sons Contracting LTD

- Saturn Groundbirch 36″
- Pipeline Right of Way Clearing

Dawson Creek, BC

Atco Electric / Cruickshank West Group

- Marguite to Wolf 
New line construction right of way clearing

Transmission Line LaCorey, AB

ENBRIDGE / CRUICKSHANK WEST GROUP

- Athabasca Twin Pipeline 
Pipeline Right of Way 
Clearing – 100 + hectares 
Cold Lake, AB

Painted Pony Petroleum

- Multiple road and lease clearing

Mile 132 Alaska Highway, BC

Imperial Oil / Tyran Transport

- Muskeg OV Program
Multiple Pad Leases

Fort McMurray, AB

Suncor Oil & Gas

- Multiple road and lease clearing

Fort St. John, BC

BC HYDRO

- Site C Access, Clearing, and Related Work
- Master Services Agreement for 2020-2022

Fort St. John, BC

BC Ministry of Transportation and Infrastructure

- Roadside vegetation clearing
- Excavator-mounted cutting tool

Dawson Creek, BC

For your next project from 1 to 1000 hectares in size, give us a call to learn more about the waste wood options available to you.