Coastal GasLink Pipeline
To help keep the project on schedule for pipeline construction, Coastal GasLink’s prime contractors for Sections 2, 3, and 4 needed 180 hectares of clearing and grubbing performed within a single winter season. This challenging terrain crossed the Rocky Mountains range from the South Peace Region to near Summit Lake, BC. Terrain and tree cover varied throughout, and snow cover was expected to grow to depths of several meters by late winter.
To handle the size and variety of this project, EM3 put together a team of 12 mulchers led by our IronWolfs and supported by our mobile repair shop and mechanical staff. The job required intense coordination with the logging contractors to maintain safe separation while keeping production high. The team completed the work just as snow cover reached working depth limits, making the site ready for soil stripping and grading by the pipeline contractors.
Some of our Other Projects
Transcanada Pipeline / Paul Paquette & Sons Contracting LTD
- Saturn Groundbirch 36″
- Pipeline Right of Way Clearing
Atco Electric / Cruickshank West Group
- Marguite to Wolf
- New line construction right of way clearing
ENBRIDGE / CRUICKSHANK WEST GROUP
- Pipeline Right of Way
- Clearing – 100 + hectares
Painted Pony Petroleum
- Multiple road and lease clearing
Imperial Oil / Tyran Transport
- Muskeg OV Program
- Multiple Pad Leases
Suncor Oil & Gas
- Multiple road and lease clearing
Fort St. John, BC
BC HYDRO
- Site C Access, Clearing, and Related Work
- Master Services Agreement for 2020-2022
Fort St. John, BC
BC Ministry of Transportation and Infrastructure
- Roadside vegetation clearing
- Excavator-mounted cutting tool
Dawson Creek, BC