WILDFIRE RISK REDUCTION
CENTRAL BC

Many interior communities are surrounded by scenic hills and forests, but these communities are at risk for significant loss of life and property if wildfire ever got out of control in the area. Reducing wildfire risk means decreasing wood fibre fuel sources in the forest, and one local contractor called upon EM3 to help. Wood had been piled throughout the wildfire risk reduction prescription areas but needed to get off site before dry spring/summer conditions arrived.

Using EM3’s fleet of horizontal grinders, supporting loaders and a continuous fleet of walking-floor style hauling trucks, our team turned over 40,000 cubic meters of wood into fibre suitable for reuse in the nearby bioenergy and wood pelleting plants in a little over two months.

Some of our Other Projects

Transcanada Pipeline / Paul Paquette & Sons Contracting LTD

- Saturn Groundbirch 36″
- Pipeline Right of Way Clearing

Dawson Creek, BC

Atco Electric / Cruickshank West Group

- Marguite to Wolf 
New line construction right of way clearing

Transmission Line LaCorey, AB

ENBRIDGE / CRUICKSHANK WEST GROUP

- Athabasca Twin Pipeline 
Pipeline Right of Way 
Clearing – 100 + hectares 
Cold Lake, AB

Painted Pony Petroleum

- Multiple road and lease clearing

Mile 132 Alaska Highway, BC

Imperial Oil / Tyran Transport

- Muskeg OV Program
Multiple Pad Leases

Fort McMurray, AB

Suncor Oil & Gas

- Multiple road and lease clearing

Fort St. John, BC

BC HYDRO

- Site C Access, Clearing, and Related Work
- Master Services Agreement for 2020-2022

Fort St. John, BC

BC Ministry of Transportation and Infrastructure

- Roadside vegetation clearing
- Excavator-mounted cutting tool

Dawson Creek, BC

For your next project from 1 to 1000 hectares in size, give us a call to learn more about the waste wood options available to you.